MSC-BUL-08-029: 0000UTC on March 21, 2008 Subject: Planned distribution stop at F13 on March 25, 2008 Maintenance work for the MTSAT-1R system is scheduled from 12:30 till 12:55 UTC on March 25, 2008. In connection with the work, the distribution of following products are scheduld to be stopped. Date: March 25, 2008 HRIT: F13. (Distribution stop) LRIT: PS-F13 and D1-F13. (Distribution stop)