MSC-BUL-08-036: 0000UTC on April 11, 2008 Subject: MTSAT-1R Spring Eclipse Operation during April 14 - 20, 2008. In connection with MTSAT-1R Spring Eclipse Operation, the distributions of following products are scheduled to be stopped, and some images might be distributed with chipping as listed below. April 14 to 18, 2008 - HRIT: F15; Distribution stop - HRIT: N15; Possibility of chipping - LRIT: PS-F15 and D1-F15; Distribution stop April 19 and 20, 2008 - HRIT: F15; Possibility of chipping - LRIT: D1-F15; Possibility of chipping