MSC-BUL-09-034: 0000UTC on March 23, 2009 Distribution time change for LRIT at PS-N04 on March 24, 2009 Maintenance work for the ground system of MTSAT-1R is scheduled on March 24, 2009. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: Date: March 24, 2009 LRIT at PS-N04: the distribution time of 04:17-04:22 UTC is changed to 04:30-04:35 UTC.