MSC-BUL-09-035: 0000UTC on March 27, 2009 MTSAT-1R Sun Avoidance Operation from March 30 to April 5, 2009 In connection with the MTSAT-1R Sun Avoidance Operation (Spring Eclipse Operation), distribution of the following products is scheduled to be stopped, and some images might be distributed with chipping as listed below: Date: March 30 to April 1, 2009 HRIT: N14; Possibility of chipping Date: April 2-5, 2009 HRIT: N14; Possibility of chipping HRIT: N15; Distribution stop LRIT: PS-N15; Distribution stop