MSC-BUL-09-081: 0900UTC on August 27, 2009 MTSAT-1R Sun Avoidance Operation from August 31 to September 6, 2009 In connection with the MTSAT-1R Sun Avoidance Operation (Autumn Eclipse Operation), distribution of the following products is scheduled to be stopped, and some images might be distributed with chipping as listed below: Date: August 31-September 1, 2009 HRIT : F15; Distribution stop HRIT : N15; Possibility of chipping LRIT : PS-F15 and D1-F15; Distribution stop Date: September 2, 2009 HRIT : N15; Possibility of chipping Date: September 3-6, 2009 HRIT : N14 and N15; Possibility of chipping