MSC-BUL-09-084: 0900 UTC on September 11, 2009 Distribution stop at F13 on September 16, 2009 Maintenance work for the MTSAT-1R system is scheduled from 12:34 UTC on September 16, 2009. In connection with this, the following dissemination will be canceled. Date: September 16, 2009 HRIT: F13 LRIT: PS-F13, D1-F13