MSC-BUL-09-095: 0300 UTC on October 19, 2009 Distribution time change for LRIT from October 5-6, 2009 Maintenance work for the ground system of MTSAT-1R is scheduled from October 5-6, 2009. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: October 5, 2009 LRIT PS-N04: the distribution time is changed to 04:30-04:35 UTC. The following operation was canceled due to typhoon, and postponed to October 20, 2009 (PS-N04). October 6, 2009 LRIT PS-N07: the distribution time is changed to 07:30-07:35 UTC.