MSC-BUL-09-118: 0900 UTC on December 15, 2009 Distribution time change for LRIT on December 18, 2009 Maintenance work for the ground system of MTSAT-1R is scheduled from December 18, 2009. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: December 18, 2009 LRIT PS-N07: the distribution time is changed to 07:30-07:35 UTC.