MSC-BUL-10-031: 0000 UTC on March 25, 2010 Distribution time change for LRIT on March 26, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled on March 26, 2010. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: March 26, 2010 LRIT PS-N07: the distribution time is changed to 07:30-07:35 UTC.