MSC-BUL-10-034: 0000 UTC on March 26, 2010 Distribution stop of HRIT/LRIT on March 30, 2010 Maintenance work for the MTSAT-1R system is scheduled on March 30, 2010. In connection with this, the following dissemination will be canceled. March 30, 2010 HRIT: F03, F07, N07 LRIT: PS-F03, D1-F03, PS-F07, D1-F07 and PS-N07