MSC-BUL-10-047: 0900 UTC on April 28, 2010 Distribution time change for LRIT on May 6, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled on May 6, 2010. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: May 6, 2010 LRIT PS-N01: the distribution time is changed to 01:30-01:35 UTC.