MSC-BUL-10-060: 0900 UTC on June 10, 2010 Distribution stop of HRIT/LRIT from June 9-10, 2010 Maintenance work for the MTSAT-1R ground system including a transmitter is scheduled from June 9 to June 10, 2010. In connection with this, the following dissemination will be canceled or affected. June 9-10, 2010 HRIT: F04, N04 LRIT: PS-F04, D1-F04 and PS-N04