MSC-BUL-10-066: 0300 UTC on June 18, 2010 Distribution stop of HRIT/LRIT from June 24-25, 2010 Maintenance work for the MTSAT-1R ground system including a transmitter is scheduled from June 24 to June 25, 2010. In connection with this, the following dissemination will be canceled. June 24-25, 2010 HRIT: F04, N04 LRIT: PS-N03, PS-F04, D1-F04 and PS-N04