MSC-BUL-10-067: 0300 UTC on June 18, 2010 Distribution time change for LRIT on June 24, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled on June 24, 2010. In connection with the work, the distribution time of the following LRIT is scheduled to be changed: June 24, 2010 LRIT PS-N08: the distribution time is changed to 08:30-08:35 UTC