MSC-BUL-10-096: 0900 UTC on September 16, 2010 Distribution stop of HRIT/LRIT on September 22, 2010 Maintenance for the MTSAT-2 system is scheduled on September 22, 2010. In connection with this, the following disseminations will be canceled. September 22, 2010 HRIT: N20 LRIT: PS-N20