MSC-BUL-10-123: 0600 UTC on November 25, 2010 Distribution time change for LRIT on December 1, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled on December 1, 2010. In connection with the work, the dissemination time of the following LRIT is scheduled to be changed: December 1, 2010 LRIT D0-F08: the dissemination time is changed to 08:30 UTC - LRIT PS-N08: the dissemination time is changed to 08:37 UTC -