MSC-BUL-10-128: 0800 UTC on December 9, 2010 Distribution time change for LRIT on December 16, 2010 Maintenance work for the ground system of MTSAT-1R is scheduled on December 16, 2010. In connection with the work, the dissemination time of the following LRIT is scheduled to be changed: December 16, 2010 LRIT D0-F08: the dissemination time is changed to 08:30 UTC - LRIT PS-N08: the dissemination time is changed to 08:35 UTC -