MSC-BUL-11-064: 0700 UTC on August 17, 2011 MTSAT-2 Equinox Operation from August 17-31, 2011 In connection with the MTSAT-2 Equinox Operation, dissemination of the following products are scheduled to be stopped, and parts of some images might be degradation by solar light as listed below: August 17-18, 2011 HRIT: F15; Possibility of degradation by solar light LRIT: PS-F15, D0-F15 and D1-F15; Possibility of degradation by solar light August 19-20, 2011 HRIT: N14 and F15; Possibility of degradation by solar light LRIT: PS-N14, PS-F15, D0-F15 and D1-F15; Possibility of degradation by solar light August 21, 2011 HRIT: F15; Dissemination stop HRIT: N14; Possibility of degradation by solar light LRIT: PS-F15; D0-F15 and D1-F15; Dissemination stop LRIT: PS-N14; Possibility of degradation by solar light August 22-31, 2011 HRIT: N14 and F15; Dissemination stop LRIT: PS-N14CPS-F15CD0-F15 and D1-F15; Dissemination stop