MSC-BUL-11-066: 0700 UTC on August 25, 2011 MTSAT-2 Equinox Operation from September 1-30, 2011 In connection with the MTSAT-2 Equinox Operation, dissemination of the following products are scheduled to be stopped, and parts of some images might be degradation by solar light as listed below: September 1-6, 2011 HRIT: N14 and F15; Dissemination stop HRIT: F14 and N15; Possibility of degradation by solar light LRIT: PS-N14, PS-F15, D0-F15 and D1-F15; Dissemination stop LRIT: PS-F14, D0-F14, D1-F14 and PS-N15; Possibility of degradation by solar light September 7-18, 2011 HRIT: F14, F15 and N15; Possibility of degradation by solar light LRIT: PS-F14, D0-F14, D1-F14, PS-F15, D0-F15, D1-F15 and PS-N15; Possibility of degradation by solar light September 19-25, 2011 HRIT: F14 and F15; Possibility of degradation by solar light LRIT: PS-F14, D0-F14, D1-F14, PS-F15, D0-F15 and D1-F15; Possibility of degradation by solar light September 26-30, 2011 HRIT: F15; Possibility of degradation by solar light LRIT: PS-F15, D0-F15 and D1-F15; Possibility of degradation by solar light