MSC-BUL-11-072: 0700 UTC on September 9, 2011 Distribution stop of HRIT/LRIT on September 23, 2011 Maintenance for the MTSAT-2 system is scheduled from 20:11 UTC on September 23, 2011. In connection with this, the following disseminations will be canceled: September 23 HRIT: N20 LRIT: PS-N20