MSC-BUL-11-085: 0700 UTC on October 20, 2011 Distribution time change for LRIT on October 25, 2011 Maintenance work for the ground system is scheduled on October 25, 2011. In connection with this, the dissemination time of the following LRIT is scheduled to be changed: October 25, 2011 LRIT : D0-F01 the distribution time is changed on 01:30 UTC - PS-N01 the distribution time is changed on 01:37 UTC -