MSC-BUL-12-024: 0700 UTC on March 15, 2012 Distribution stop of HRIT/LRIT on March 19, 2012 Maintenance for the MTSAT-2 system is scheduled from 20:25 UTC on March 19, 2012. In connection with this, the following disseminations will be canceled: March 19 HRIT: F21 LRIT: PS-F21, D0-F21 and D1-F21