MSC-BUL-13-052: 0700 UTC on July 25, 2013 Distribution stop of HRIT/LRIT on July 31, 2013 Maintenance for the MTSAT-2 system is scheduled from 20:24 UTC on July 31, 2013. In connection with this, the following dissemination is cancelled: July 31, 2013 HRIT: F21 LRIT: PS-F21, D0-F21 and D1-F21