MSC-BUL-13-065: 0700 UTC on September 12, 2013 Distribution stop of HRIT/LRIT on September 22, 2013 Maintenance for the MTSAT-2 system is scheduled from 20:10 UTC on September 22, 2013. In connection with this, the following dissemination is cancelled: September 22, 2013 HRIT: N20 LRIT: PS-N20