MSC-BUL-14-020: 0700 UTC on 27 February, 2014 Discontinuation of HRIT/LRIT distribution on 5 March, 2014 Maintenance of the MTSAT-2 system is scheduled to take place from 20:29 UTC on 5 March, 2014. As a result, the following dissemination will be cancelled: 5 March, 2014 HRIT: F21 LRIT: PS-F21, D0-F21 and D1-F21